Ease of Doing Business


1. Ease of Doing Business and Facilities in Yamuna Expressway Industrial Development Area

 1.1 Yamuna Expressway to Business Prosperity – Link

2. Information of Industrial / Mix Land Use Sector

 2.1 Rate of Industrial Allotment – Link
2.2 Rate of Mixed Land Use Allotment – Link
2.3 List of industry which may be permitted in industrial area – Link

3. General Criterion of Land Allotment

 3.1 For Industrial Plots up to 4000 Sq. M. – Link
3.1 For Industrial Plots above 4000 Sq. M. – Link
3.2 Timelines for Processing of application of Land allotment – Link

4 Allotment under Industrial Scheme upto 4000 Sqm

 4.1 Status of Allotment – Open ended scheme – Link
4.2 Procedure of Allotment – Link
4.3 For industrial Plots upto 2000 Sqm – Link
4.4 Industrial / 2000 (2013) -01 – Link
4.5 Industrial / 2000 (2013) -02 – Link
4.6 Industrial / 2000 (2016)-03 – Link
4.7 Vacant List of Industrial Plots – Link
4.8 Map of Industrial Sector-32 – Link
4.9 Map of Industrial Sector-33 – Link
4.10 Surrender Details (Sector 32-33) – Link
4.11 Progress Report of Industry Division – Link

5. Allotment under Open Ended Industrial Scheme above 2100 Sqm

 5.1 Status of Allotment – Link
5.2 Procedure of Allotment
5.2. (i) For industrial Plots larger than 4000 Sqm – Link
5.2. (i) Allotment under open ended Scheme – Link
5.3 Map of Industrial Sector-32 – Link
5.4 Map of Industrial Sector-33 – Link

6. Allotment under Open Ended Mix Land Use Scheme

 6.1 Status of Allotment – Link
6.2 Procedure of Allotment – Link

7. Information of Planning

 7.1 Master Plan of Yamuna
7.1.1 Master Plan 2021 – Link
7.1.2 Master Plan 2031 – Link 7.2 Building Byelaws
7.2.1 Building Byelaws – Link7.3 Building Plan Approval and Completion

a. Documents required for Sanction of Individual Plots – Link
(i) For Individual – Link
(a) Appendix-01 – Link
(b) Appendix-02 – Link
(c) Appendix-03 – Link
(d) Appendix-04 – Link
(e) Appendix-05 – Link
(f) Appendix-06 – Link
(g) Appendix-07 – Link
(h) Appendix-12 – Link

(ii) Documents required for Sanction of Plots other than Individual Residential Plots – Link
(a) Appendix-01 – Link
(b) Appendix-02 – Link
(c) Appendix-03 – Link
(d) Appendix-04 – Link
(e) Appendix-05 – Link
(f) Appendix-06 – Link
(g) Appendix-07 – Link
(g) Appendix-8(A)/8(B)/8(C) – Link
(h) Appendix-12 – Link

(iii) Documents required for Approval of Temporary Structures – Link
(a) Appendix-01 – Link
(b) Appendix-02 – Link
(c) Appendix-03 – Link
(d) Appendix-04 – Link
(h) Appendix-12 – Link

(iv) For Sanction/Approval of Layouts and Sub-Division – Link
(a) Appendix-01 – Link
(b) Appendix-02 – Link
(c) Appendix-03 – Link
(d) Appendix-04 – Link
(e) Appendix-05 – Link
(f) Appendix-06 – Link
(g) Appendix-07 – Link
(g) Appendix-8(A)/8(B)/8(C) – Link
(h) Appendix-12 – Link

7.4 Timeline for Sanction or Refusal of Building Permit – Link

7.5 Mandatory provision for site visit (Inspection) – Link

7.6 Single joint site inspection by various Govt. Authorities responsible for granting construction permit – Link

7.7 Format for deemed sanction – Link

7.8 Change of Land Use – There is no provision for change of Land use in the authority. If in future, any such provision will be made. It shall be informed through public notice

8. Project

 8.1 Water & Sewer connection charges – Link
8.2 Online Form Submission of Water Connection – Link
8.3 Online Form Submission of Sewer Connection – Link
8.4 Format of Temporary Sewer/Water Connection – Link
8.5 Challan Format of Water/Sewer – Link
8.6 Formal Application Format of Water/ Sewer Connection – Link
8.7 Timeline for obtaining Water and Sewer /Sewer Connection – Link
8.8 Steps for obtaining Water and Sewer /Sewer Connection – Link

9. Online Map Approval/Sanction Interface

 9.1 Online Map Approval/Sanction Interface – Link
9.2 Procedure for Online Map Sanction Completion System Part 1 – Link
9.3 Procedure for Online Map Sanction Completion System Part 2 – Link

10. Progress Report – Ease of Doing Business

 11.1 Progress Report Ease of Doing Business (July 2017) – Link