{"id":1624,"date":"2021-12-29T06:03:09","date_gmt":"2021-12-29T06:03:09","guid":{"rendered":"https:\/\/demo1.solarman.in\/yeida_beta\/?page_id=1624"},"modified":"2023-10-21T19:23:07","modified_gmt":"2023-10-21T19:23:07","slug":"civil-works","status":"publish","type":"page","link":"https:\/\/www.yamunaexpresswayauthority.com\/web\/about-us\/infrastructure\/civil-works\/","title":{"rendered":"Civil Works"},"content":{"rendered":"<p>[vc_row][vc_column][vc_column_text]<\/p>\n<h3 style=\"text-align: center;\">Civil Works<\/h3>\n<hr \/>\n<p>[\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][\/vc_column][\/vc_row][vc_row][vc_column][vc_tta_accordion c_position=&#8221;right&#8221; active_section=&#8221;1&#8243;][vc_tta_section title=&#8221;Sector 17A&#8221; tab_id=&#8221;sector-17A&#8221;][vc_column_text]<span style=\"font-weight: 400;\">Sector 17A is designed for Institutional and residential land use with an area of approximately 425.9 Ha. Authority has completed internal and external development (roads of 120m and 30m, sewer, drains, water supply, electrification). A 3000 Kl capacity UGR has also been completed. The sector has fourteen Institutional plots, one recreational, one township and over twenty seven corporate office plots.<\/span>[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;Sector 18&#8243; tab_id=&#8221;sector-18&#8243;][vc_column_text]<span style=\"font-weight: 400;\">It is a residential sector of area approximately 1846 Ha. The whole area is divided into pockets. A total of 12748 number of plots are employed in Sector-18, in which internal and external development works (sewerage, drainage, road and electrification) are in progress. In addition to the above, construction of OHTs having capacity 2700 Kilolitres and 2400 Kilolitres and 4 tube wells work is complete.<\/span>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_single_image image=&#8221;1731&#8243; img_size=&#8221;full&#8221; add_caption=&#8221;yes&#8221; alignment=&#8221;center&#8221;][\/vc_tta_section][vc_tta_section title=&#8221;Sector 20&#8243; tab_id=&#8221;sector-20&#8243;][vc_column_text]<span style=\"font-weight: 400;\">In Sector-20 a total of 10981 residential plots are planned in total area of 1485 Ha. The sector is divided in 19 pockets, in which <\/span><span style=\"font-weight: 400;\">internal and external development works (roads, sewer, drains, water supply, electrification) <\/span><span style=\"font-weight: 400;\">are under\u00a0 progress in all the pockets.The construction work of four OHTs and eight tube wells work is complete.<\/span>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;2250&#8243; img_size=&#8221;350&#215;300&#8243;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;2248&#8243; img_size=&#8221;full&#8221; el_class=&#8221;middle-image-s20&#8243;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;2249&#8243; img_size=&#8221;350&#215;300&#8243;][\/vc_column_inner][\/vc_row_inner][\/vc_tta_section][vc_tta_section title=&#8221;Sector 22D &#038; 22E&#8221; tab_id=&#8221;sector-22D-22E&#8221;][vc_column_text]<span style=\"font-weight: 400;\">Sector 22D\u00a0 is a residential, township, group housing sector of approximately 440.8 Ha area. About 5100 affordable houses, 1320 LIG houses, 768 MIG houses are constructed along with shops and office complex. Internal and external development works (sewerage, drainage, road and electrification) are\u00a0 in progress. One OHT and three UGRs have been completed.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Sector 22E is an institutional and corporate office (commercial) sector of approximately 345 Ha area. It has a total of 73 institutional plots, 3 facilities plots and 16 corporate office plots. Internal and external development works (roads, sewerage, drainage, water supply and electrification) are in progress. One OHT and three UGRs have been completed.<\/span>[\/vc_column_text][vc_media_grid gap=&#8221;10&#8243; grid_id=&#8221;vc_gid:1697915553461-92aa6553-3c22-5&#8243; include=&#8221;3969,3970,3971&#8243; css=&#8221;.vc_custom_1697915546284{margin-top: 20px !important;margin-bottom: 5px !important;}&#8221;][\/vc_tta_section][vc_tta_section title=&#8221;Sector 24 &#038; 24A&#8221; tab_id=&#8221;sector-24-24A&#8221;][vc_column_text]<span style=\"font-weight: 400;\">It is primarily an industrial sector of approximately 697 Ha area and a\u00a0 total of 42 nos. of plots have been planned under the sector, under which the plots of Dharampal Satpal Ltd., Vivo Mobile India Pvt. Ltd. and Patanjali Ayurveda Ltd. Industries have been allotted. Internal and external development works of the sector (water supply, drainage, sewerage, roads and electrification) are partially completed. The work of 2600 Kilolitre UGR and 2500 Kilolitre OHT has been completed.<\/span>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_row_inner css=&#8221;.vc_custom_1697914891347{margin-bottom: 20px !important;}&#8221;][vc_column_inner css=&#8221;.vc_custom_1697915020548{margin-bottom: 10px !important;}&#8221;][vc_media_grid element_width=&#8221;3&#8243; grid_id=&#8221;vc_gid:1697915553465-cfcf4f77-4a97-7&#8243; include=&#8221;3961,3962,3963,3964&#8243;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;1732&#8243; img_size=&#8221;full&#8221; add_caption=&#8221;yes&#8221; el_class=&#8221;tower-image&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;2\/3&#8243;][vc_single_image image=&#8221;1733&#8243; img_size=&#8221;full&#8221; add_caption=&#8221;yes&#8221;][\/vc_column_inner][\/vc_row_inner][\/vc_tta_section][vc_tta_section title=&#8221;Sector 26A &#038; 26B&#8221; tab_id=&#8221;section-26A-26B&#8221;][vc_column_text]<span style=\"font-weight: 400;\">Sector 26 A is designed for one township project and two group housing projects. A 60 Mtr wide road has been constructed by Authority in front of these projects.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Sector 26 B is an institutional sector. It is situated on 30 Mtr wide road parallel to 100 Mtr wide Yamuna Expressway. In this sector one plot of 100 Acre area is planned. External development work (Road, Drain and sewer) has been already completed.<\/span>[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;Sector 29&#8243; tab_id=&#8221;sector-29&#8243;][vc_empty_space height=&#8221;20px&#8221;][vc_column_text]<span style=\"font-weight: 400;\">It is an industrial sector of approximately 670 Ha area. Provision has been made for industrial plots for MSME, Apparel &amp; Handicraft Park under the sector. 45 meter, 30 meter and 24 meter wide roads have been planned. Under the development works, development works of water supply, RCC drain, sewer line road etc. are in progress.<\/span>[\/vc_column_text][vc_row_inner css=&#8221;.vc_custom_1697891888829{margin-top: 20px !important;}&#8221;][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;3939&#8243; img_size=&#8221;270*300&#8243;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;3941&#8243; img_size=&#8221;270*300&#8243;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;3942&#8243; img_size=&#8221;270*300&#8243;][\/vc_column_inner][\/vc_row_inner][\/vc_tta_section][vc_tta_section title=&#8221;Sector 32&#8243; tab_id=&#8221;sector-32&#8243;][vc_column_text]<span style=\"font-weight: 400;\">It is an industrial sector of approximately 497.5 Ha area having a total of 1888 plots.Internal and external development works (roads, sewerage, drainage, water supply and electrification) are completed. Two tubewells are completed and a UGR of 2600 Kilolitres capacity is under construction.<\/span>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_row_inner][vc_column_inner width=&#8221;1\/4&#8243;][vc_single_image image=&#8221;3946&#8243; img_size=&#8221;full&#8221; el_class=&#8221;image-s32&#8243;][\/vc_column_inner][vc_column_inner width=&#8221;1\/4&#8243;][vc_single_image image=&#8221;3947&#8243; img_size=&#8221;full&#8221; el_class=&#8221;image-s32&#8243;][\/vc_column_inner][vc_column_inner width=&#8221;1\/4&#8243;][vc_single_image image=&#8221;3948&#8243; img_size=&#8221;full&#8221; el_class=&#8221;image-s32&#8243;][\/vc_column_inner][vc_column_inner width=&#8221;1\/4&#8243;][vc_single_image image=&#8221;3949&#8243; img_size=&#8221;full&#8221; el_class=&#8221;image-s32&#8243;][\/vc_column_inner][\/vc_row_inner][\/vc_tta_section][vc_tta_section title=&#8221;Sector 33&#8243; tab_id=&#8221;sector-33&#8243;][vc_empty_space height=&#8221;20px&#8221;][vc_column_text]Sector 33 (Toy Park)[\/vc_column_text][vc_row_inner css=&#8221;.vc_custom_1697891888829{margin-top: 20px !important;}&#8221;][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;3951&#8243; img_size=&#8221;270*300&#8243;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;3952&#8243; img_size=&#8221;270*300&#8243;][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;3953&#8243; img_size=&#8221;270*300&#8243;][\/vc_column_inner][\/vc_row_inner][\/vc_tta_section][vc_tta_section title=&#8221;Other Major Roads&#8221; tab_id=&#8221;other-major-roads&#8221;][vc_column_text]<span style=\"font-weight: 400;\">(a) 120m wide Road<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The construction work of length 13.80 km is complete. On the right side of Yamuna Expressway up to 8.80 km has been constructed, on which various Group Housing, Industrial Unit, VIVO, Patanjali Food Processing Unit and Institutional Plot Sectors are located. Sectors have been planned for residential and institutional plots on both sides of this road. It is the main road to reach Jewar airport via various sectors.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">(b) 100 m wide road<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The construction work of 3.50 km length from Yamuna Expressway is complete. There are residential plots of Sector-18 on the left side of this road and Sector-20 on the right. The work of DBM\/BC on the said road has been completed and drainage works are under progress.<\/span>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_row_inner][vc_column_inner][vc_single_image image=&#8221;1745&#8243; img_size=&#8221;full&#8221; add_caption=&#8221;yes&#8221; alignment=&#8221;center&#8221;][\/vc_column_inner][\/vc_row_inner][\/vc_tta_section][\/vc_tta_accordion][\/vc_column][\/vc_row][vc_row disable_element=&#8221;yes&#8221;][vc_column width=&#8221;1\/3&#8243;][vc_column_text]<\/p>\n<ul class=\"mstrplan\">\n<li><a href=\"https:\/\/www.yamunaexpresswayauthority.com\/web\/about-us\/infrastructure\/civil-works\/expressway\/\">Yamuna Expressway<\/a><\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_tta_accordion c_position=&#8221;right&#8221; active_section=&#8221;1&#8243;][vc_tta_section title=&#8221;Sector 17&#8243; tab_id=&#8221;1641380995385-e71980bb-a622&#8243;][vc_column_text]<span style=\"font-weight: 400;\">Sector 17 A is designed for Institutional and residential area. Authority has also completed internal and external development, internal &amp; external (H.T &amp; L.T) electrification work complete and street light work completed<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In the development works of the road, 120 m wide road is under construction and in internal development works, most of the construction work of 30 m wide road is complete, works of including water supply, drain, sewer, road and additional reservoir of 2500 kg capacity are also in progress.<\/span>[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;Sector 18&#8243; tab_id=&#8221;1641380995429-5b52b67a-7335&#8243;][vc_column_text]<span style=\"font-weight: 400;\">A total of 12748 nos. of plots are employed in Sector-18, in which internal development work is in progress. In addition to the above, in Sector-18, 5100 Kilolitres capacity OHT work is complete. The construction work of 4 nos. of tube wells has been completed in the said sector.<\/span>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_single_image image=&#8221;1731&#8243; img_size=&#8221;full&#8221; add_caption=&#8221;yes&#8221; alignment=&#8221;center&#8221;][\/vc_tta_section][vc_tta_section title=&#8221;Section 20&#8243; tab_id=&#8221;1641380995498-f9541cad-041c&#8221;][vc_column_text]<span style=\"font-weight: 400;\">In Sector-20, a total of 10981 plots are planned in which development work is in progress in all the pockets. <\/span><span style=\"font-weight: 400;\">Construction of 60Mtr wide and 100Mtr wide road in Sector 18 are under construction through various agencies.<\/span><span style=\"font-weight: 400;\">The construction work of 6300 Kilolitres capacity OHT work is complete.<\/span><\/p>\n<p>[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;Sector 22&#8243; tab_id=&#8221;1641380995547-376c9619-fc6c&#8221;][vc_column_text]<span style=\"font-weight: 400;\">At present, about 40 percent work of 30 meters and 24 meters of road, drainage and sewerage has been completed. Tender for 30 m wide road parallel to expressway has been accepted and work has been started. <\/span><span style=\"font-weight: 400;\">In sector 22D construction of 4 storeyed 4425 Nos. affordable houses has been completed.<\/span>[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;Sector 24&#8243; tab_id=&#8221;1641380995585-078ec512-f6d2&#8243;][vc_column_text]<span style=\"font-weight: 400;\">A total of 42 nos. of plots have been planned under the sector, under which the plots of Dharampal Satpal Ltd., Vivo Mobile India Pvt. Ltd. and Patanjali Ayurveda Ltd. Industries have been allotted. In the internal development works of the sector, mainly the construction work of 45 m wide road is in progress and the development work of 30 m and 100 m wide roads, the work of water supply line, UGR and OHT under the sector has also been completed.<\/span>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_row_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;1732&#8243; img_size=&#8221;full&#8221; add_caption=&#8221;yes&#8221; el_class=&#8221;tower-image&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;2\/3&#8243;][vc_single_image image=&#8221;1733&#8243; img_size=&#8221;full&#8221; add_caption=&#8221;yes&#8221;][\/vc_column_inner][\/vc_row_inner][\/vc_tta_section][vc_tta_section title=&#8221;Sector 29&#8243; tab_id=&#8221;1641380995743-75e648c9-7850&#8243;][vc_empty_space height=&#8221;20px&#8221;][vc_column_text]<span style=\"font-weight: 400;\">Provision has been made for industrial plots for MSME, Apparel &amp; Handicraft Park under the sector. 45 meter, 30 meter and 24 meter wide roads have been planned. Under the development works, development works of water supply, RCC drain, sewer line road etc. are in progress.<\/span>[\/vc_column_text][vc_row_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;1742&#8243; img_size=&#8221;300&#215;200&#8243; add_caption=&#8221;yes&#8221; alignment=&#8221;center&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;1740&#8243; img_size=&#8221;300&#215;200&#8243; add_caption=&#8221;yes&#8221; alignment=&#8221;center&#8221;][\/vc_column_inner][\/vc_row_inner][\/vc_tta_section][vc_tta_section title=&#8221;Section 32 &amp; 33&#8243; tab_id=&#8221;1641380995910-3940c289-04c6&#8243;][vc_column_text]<span style=\"font-weight: 400;\">Under the internal development works of sector 32; plots, the works of road, sewer, drain, water supply line and tube well are almost complete. Under the internal development work of sector 33, the work of 30 m and 24 m wide roads, drain, sewer and water supply are in progress.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The process of purchasing the residual land for the development works of Sector-32 and 33 is in progress and the remaining development works are being done simultaneously.<\/span>[\/vc_column_text][\/vc_tta_section][vc_tta_section title=&#8221;Other Major Roads&#8221; tab_id=&#8221;1641380995949-c3b54bd7-e897&#8243;][vc_column_text]<span style=\"font-weight: 400;\">(a) 120m wide Road<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The construction work of length 13.80 km is complete. On the right side of Yamuna Expressway up to 8.80 km has been constructed, on which various Group Housing, Industrial Unit, VIVO, Patanjali Food Processing Unit and Institutional Plot Sectors are located. Sectors have been planned for residential and institutional plots on both sides of this road. It is the main road to reach Jewar airport via various sectors.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">(b) 100 m wide road<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The construction work of 3.50 km length from Yamuna Expressway is complete. There are residential plots of Sector-18 on the left side of this road and Sector-20 on the right. The work of DBM\/BC on the said road has been completed and drainage works are under progress.<\/span>[\/vc_column_text][vc_empty_space height=&#8221;20px&#8221;][vc_row_inner][vc_column_inner][vc_single_image image=&#8221;1745&#8243; img_size=&#8221;full&#8221; add_caption=&#8221;yes&#8221; alignment=&#8221;center&#8221;][\/vc_column_inner][\/vc_row_inner][\/vc_tta_section][\/vc_tta_accordion][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text] Civil Works [\/vc_column_text][vc_empty_space height=&#8221;30px&#8221;][\/vc_column][\/vc_row][vc_row][vc_column][vc_tta_accordion c_position=&#8221;right&#8221; active_section=&#8221;1&#8243;][vc_tta_section title=&#8221;Sector 17A&#8221; tab_id=&#8221;sector-17A&#8221;][vc_column_text]Sector 17A is designed for Institutional and residential land use with an area of approximately 425.9 Ha. Authority has completed internal and external development (roads of 120m and 30m, sewer, drains, water supply, electrification). A 3000 Kl capacity UGR has also been completed. The sector has [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":300,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-1624","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.yamunaexpresswayauthority.com\/web\/wp-json\/wp\/v2\/pages\/1624","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.yamunaexpresswayauthority.com\/web\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.yamunaexpresswayauthority.com\/web\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.yamunaexpresswayauthority.com\/web\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yamunaexpresswayauthority.com\/web\/wp-json\/wp\/v2\/comments?post=1624"}],"version-history":[{"count":49,"href":"https:\/\/www.yamunaexpresswayauthority.com\/web\/wp-json\/wp\/v2\/pages\/1624\/revisions"}],"predecessor-version":[{"id":3978,"href":"https:\/\/www.yamunaexpresswayauthority.com\/web\/wp-json\/wp\/v2\/pages\/1624\/revisions\/3978"}],"up":[{"embeddable":true,"href":"https:\/\/www.yamunaexpresswayauthority.com\/web\/wp-json\/wp\/v2\/pages\/300"}],"wp:attachment":[{"href":"https:\/\/www.yamunaexpresswayauthority.com\/web\/wp-json\/wp\/v2\/media?parent=1624"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}